North Royalton WWTP New Influent Pump Station

North Royalton, OH
TYPE: Industrial | Waste Water
SIZE: n/a
COST: $4,494,000
COMPLETED: 2018
SCOPE: Construction of a 22 MGD Influent Pump Station including a 35-feet deep excavation with shoring, dewatering, cast-in-place concrete, masonry electrical room, installation of six submersible pumps with associated discharge piping, electrical, controls and 140 feet of 30” force main that ties into the plants existing elevated influent channel.
• Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images


NEORSD: Easterly Primary Settling Tanks No’s 9-12 Rehabilitation

Cleveland, OH
TYPE: Industrial | Waste Water
SIZE: n/a
COST: $1,515,034
COMPLETED: 2016
SCOPE: Replacement of the chain and flights sludge collection systems in primary settling tanks 9,10,11 & 12 at the Easterly Waste Water Treatment Plant. Each basin consists of three collectors and one cross collector.
• Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images



Chain & Flight Sludge Collection System Replacement

Akron, OH
TYPE: Industrial | Waste Water
SIZE: n/a
COST: $389,870
COMPLETED: 2016
SCOPE: Replacement of the chain and flight sludge collection system in sedimentation Basin 1 & 2 at the Akron Water Plant. Each basin consists of four collectors and one cross collector.
• Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images

French Creek WWTP – Grit Removal Equipment Replacement

North Ridgeville, OH
TYPE: Industrial | Waste Water
SIZE: n/a
COST: $1,169,592
COMPLETED: 2016
SCOPE: Replacement of the grit collection system at the French Creek Waste Water Treatment Plant. Project included: selective demolition, cast-in-place concrete, miscellaneous metals, equipment installation, process piping, HVAC, electrical and controls upgrades/integrations.
• Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images

Barberton WWTP Improvements & Snyder Avenue Pump Station Upgrades

Barberton, OH
TYPE: Industrial | Waste Water
SIZE: n/a
COST: $3,900,000
COMPLETED: 2015
SCOPE: This project encompasses two separate projects for the City of Barberton. Major renovations at both sites include replacement of mechanical bar screens and belt conveyers with a new bar screen and screen washer. Various pump replacements, installation of a new sodium aluminate storage and feed system, and various electrical upgrades.
• Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images

NEORSD: EMSC Lab Improvements

Cleveland, OH
TYPE: Industrial | Waste Water
SIZE: 50,000 sq. ft.
COST: $6,690,000
COMPLETED: 2013
SCOPE: Complete renovation of existing 18,000 sq. ft. lab used for mandated daily water testing. The project included site demolition, cast in place concrete, masonry, roofing, and lab casework.
• Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images

Keller Water Tower II

Brunswick, OH
TYPE: Industrial | Infrastructure
SIZE: 1,000,000 gallons
COST: $4,276,142
COMPLETED: 2011
SCOPE: Single prime contractor for the construction of a 1 million gallon elevated water storage tower.
• Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images

RTA-West 150th & Puritas Station

Cleveland, OH
TYPE: Industrial | Transportation
SIZE: 6,500 sq. ft.
COST: $8,450,313
COMPLETED: 2011
SCOPE: General trades contractor for the demolition of existing stations. Provided a temporary pedestrian bridge over the tracks in order to keep the station functioning throughout construction. Constructed state-of-the-art ADA accessible transportation facility.
• Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images

S.R. 174 & 84 Booster Pump Station Upgrade

Willoughby, OH
TYPE: Industrial | Waste Water
SIZE: n/a
COST: $297,041
COMPLETED: 2013

Glenville Waste Station

Glenville, OH
TYPE: Industrial | Waste Water
SIZE: n/a
COST: $657,900
COMPLETED: 2006

RTA: Eagle Ave.Substation

Cleveland, OH
TYPE: Industrial | Infrastructure
SIZE: n/a
COST: $428,000
COMPLETED: 2005

RTA: L/M/N Bridge Repair

Cleveland, OH
TYPE: Industrial | Infrastructure
SIZE: n/a
COST: $2,124,900
COMPLETED: 2005
SCOPE: Repairs and renovations to three RTA bridges. Removal and replacement of ballast; shoring and jacking of abutments and tracks. Bridges remained operational during construction.
• Images • Images

RTA: Shaker Rapid Transit ADA

Shaker Heights, OH
TYPE: Industrial | Transportation
SIZE: n/a
COST: $736,200
COMPLETED: 2005

RTA: Brookpark Temporary Station

Brookpark, OH
TYPE: Industrial | Transportation
SIZE: n/a
COST: $946,000
COMPLETED: 2002