NEORSD: Easterly Primary Settling Tanks No’s 9-12 Rehabilitation

Cleveland, OH
TYPE: Industrial | Waste Water
SIZE: n/a
COST: $1,515,034
COMPLETED: 2016
SCOPE: Replacement of the chain and flights sludge collection systems in primary settling tanks 9,10,11 & 12 at the Easterly Waste Water Treatment Plant. Each basin consists of three collectors and one cross collector.
• Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images



Chain & Flight Sludge Collection System Replacement

Akron, OH
TYPE: Industrial | Waste Water
SIZE: n/a
COST: $389,870
COMPLETED: 2016
SCOPE: Replacement of the chain and flight sludge collection system in sedimentation Basin 1 & 2 at the Akron Water Plant. Each basin consists of four collectors and one cross collector.
• Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images

French Creek WWTP – Grit Removal Equipment Replacement

North Ridgeville, OH
TYPE: Industrial | Waste Water
SIZE: n/a
COST: $1,169,592
COMPLETED: 2016
SCOPE: Replacement of the grit collection system at the French Creek Waste Water Treatment Plant. Project included: selective demolition, cast-in-place concrete, miscellaneous metals, equipment installation, process piping, HVAC, electrical and controls upgrades/integrations.

Barberton WWTP Improvements & Snyder Avenue Pump Station Upgrades

Barberton, OH
TYPE: Industrial | Waste Water
SIZE: n/a
COST: $3,900,000
COMPLETED: 2015
SCOPE: This project encompasses two separate projects for the City of Barberton. Major renovations at both sites include replacement of mechanical bar screens and belt conveyers with a new bar screen and screen washer. Various pump replacements, installation of a new sodium aluminate storage and feed system, and various electrical upgrades.
• Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images

NEORSD: EMSC Lab Improvements

Cleveland, OH
TYPE: Industrial | Waste Water
SIZE: 50,000 sq. ft.
COST: $6,690,000
COMPLETED: 2013
SCOPE: Complete renovation of existing 18,000 sq. ft. lab used for mandated daily water testing. The project included site demolition, cast in place concrete, masonry, roofing, and lab casework.
• Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images

Keller Water Tower II

Brunswick, OH
TYPE: Industrial | Infrastructure
SIZE: 1,000,000 gallons
COST: $4,276,142
COMPLETED: 2011
SCOPE: Single prime contractor for the construction of a 1 million gallon elevated water storage tower.
• Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images

RTA-West 150th & Puritas Station

Cleveland, OH
TYPE: Industrial | Transportation
SIZE: 6,500 sq. ft.
COST: $8,450,313
COMPLETED: 2011
SCOPE: General trades contractor for the demolition of existing stations. Provided a temporary pedestrian bridge over the tracks in order to keep the station functioning throughout construction. Constructed state-of-the-art ADA accessible transportation facility.
• Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images • Additional Images

S.R. 174 & 84 Booster Pump Station Upgrade

Willoughby, OH
TYPE: Industrial | Waste Water
SIZE: n/a
COST: $297,041
COMPLETED: 2013

Glenville Waste Station

Glenville, OH
TYPE: Industrial | Waste Water
SIZE: n/a
COST: $657,900
COMPLETED: 2006

RTA: Eagle Ave.Substation

Cleveland, OH
TYPE: Industrial | Infrastructure
SIZE: n/a
COST: $428,000
COMPLETED: 2005

RTA: L/M/N Bridge Repair

Cleveland, OH
TYPE: Industrial | Infrastructure
SIZE: n/a
COST: $2,124,900
COMPLETED: 2005
SCOPE: Repairs and renovations to three RTA bridges. Removal and replacement of ballast; shoring and jacking of abutments and tracks. Bridges remained operational during construction.
• Images • Images

RTA: Shaker Rapid Transit ADA

Shaker Heights, OH
TYPE: Industrial | Transportation
SIZE: n/a
COST: $736,200
COMPLETED: 2005

RTA: Brookpark Temporary Station

Brookpark, OH
TYPE: Industrial | Transportation
SIZE: n/a
COST: $946,000
COMPLETED: 2002